Jobs Electrical Engineer in the Toronto Region
Green job Help - Green job - Help

Available jobs

We found 27 electrical engineer jobs in the Toronto Region on Job Bank. The job postings found are for all Electrical and electronics engineers (NOC 21310).

Location Available jobs Links
Toronto Region 27 View job postings >
Ontario 47 View job postings >
Canada 199 View job postings >
Job postings throughout the region
Date posted Job title Employer Location Source
Mar 13, 2025 circuit design engineer Ensil Inc Markham (ON) Job Bank
Mar 13, 2025 radiofrequency (rf) engineer   Ensil Inc Markham (ON) Job Bank
Mar 19, 2025 automation engineer Vision Hollow Metal Vaughan (ON) indeed.com
Mar 11, 2025 electrical engineer Nadine International Inc. Mississauga (ON) indeed.com
Mar 8, 2025 electrical engineer T Engineering Oakville (ON) indeed.com
Mar 21, 2025 electrical controls engineer AECOMETRIC CORPORATION Richmond Hill (ON) ZipRecruiter
Mar 17, 2025 automation engineer TD Bank Toronto (ON) CareerBeacon
Mar 20, 2025 electrical controls engineer Korber Supply Chain LLC Mississauga (ON) indeed.com
Mar 13, 2025 automation engineer TD Bank Toronto (ON) CareerBeacon
Mar 21, 2025 electrical engineer Sense Engineering Toronto (ON) Monster

News

Read the latest news stories about job creation and layoffs related to the occupation ofindustrial instrument service technician (NOC 22312).

The Sahtu Land and Water Board is expediting the process to grant Imperial Oil an emergency three-year water license at its Norman Wells oil operation. While the operation undergoes an environmental assessment, the license prevents shutting down operations and potential environmental risks.

  • Other type of event
  • Mining and oil and gas extraction
  • Added on 2025-01-14
  • Northwest Territories, NT

The federal government is providing $25M to the Northwest Territories government for the Taltson hydro expansion project. The project involves connecting the North and South Slave systems and building a new facility south of Great Slave Lake. The NWT government aims to support future critical mineral mining in the territory and mitigate energy prices with the hydro expansion.

  • Job creation
  • Utilities
  • Added on 2024-11-13
  • Northwest Territories, NT

The Taltson hydro plant upgrades have been delayed and are now estimated to cost the Northwest Territories (NWT) government an additional $31 million, bringing the total cost to $100 million. The hydro plant has been offline since May 2023 due to a wildfire and technical issues, and no date has been set for its resumption of operations. The plant supplies power to South Slave communities, which are relying on diesel

  • Other type of event
  • Utilities
  • Added on 2024-10-20
  • Northwest Territories, NT

Canada Energy Regulator approved the Inuvialuit Energy Security Project Ltd. application to install and operate a natural gas plant and transport compressed natural gas and other fuels. The energy plant is estimated to provide 25 direct and 50 indirect permanent full-time jobs, and contract work for 50 years. Priority will be given to local workers and businesses.

  • Job creation
  • Mining and oil and gas extraction
  • Added on 2024-03-07
  • Northwest Territories, NT
Labour Market Information Survey
Date modified: